Definition
|
The project Final Design Review (FDR) is the formal Design Review held
at the end of the Test Stage.
The objectives of the project FDR are to:
-
Make sure that recommendations from previous Design Reviews have been taken
into account
-
Formally approve the test work
-
Formally approve the product final design
-
Check whether the expected technical performance allow to remain within
the project contract margins
|
Questions
|
Technical assessment
-
Are the results of Alpha test acceptable?
-
Are the results of Beta test acceptable?
-
Can the product design be frozen?
-
Is there any outstanding technical issue preventing us from moving forward
to the Release Stage?
Cross-functional check
-
Does the product detailed design meet all the Serviceability requirements?
-
Does the product detailed design meet all the Manufacturing requirements?
-
Does the product detailed design meet all the Manufacturing Test requirements?
-
Are there any outstanding sourcing issues with the product design?
-
Does the current product detailed design support the cost objectives for
the product / solution?
Readiness for Detailed Design Stage
-
Is Manufacturing / Contract Manufacturer ready to 1st Production Build?
-
Are all product components available to start 1st Production Build?
-
Are resources and equipment available?
-
Have we identified additional risk areas (technical, cost, schedule basis)
since Alpha Readiness Review and if so, what are the contingencies?
-
Will the expected technical performance allow to remain within the project
contract margins?
|
Input
|
Marketing
-
MRD (remains a living document after the Planning & Specification Stage Review but with limited changes
expected)
Service
-
Serviceability objectives
-
Product Service Plan
R&D Test
Alpha
-
"Formal" Alpha test results
-
Bug list to DDTS
-
Suggested enhancement list
-
Input to release notes (with severity bugs)
-
Product operating procedures for training and CSO people
Beta
-
Beta site reports
-
List of bugs
Agency Certification
-
Agency certificate and/or official external lab test report
Manufacturing
-
Delivery of Pilot units to Atrica
-
Pilot Build report including Final assembly & test yields
-
Process validation documents for Manufacturability and Testability- Process
Readiness
Manufacturing Test
-
Updated test S/W version (also made available to CM)
-
Production test equipment updated after modifications
Materials
-
List of qualified vendors
Finance
-
Estimates of product GM in production (on a per component basis)
|
Deliverables
|
Review
organization , FDR
presentation template , Production
file procedure |