Definition
|
The objectives of the Design Review for Software held before the project
CDR are as follows:
-
Review and validate the detailed design of the S/W from technical standpoint
-
Ensure that the detailed design of S/W meets all project requirements
-
Clearly identify the risks related to S/W and possible contingencies
-
Approve proposed schedule for S/W implementation work to be conducted during
Implementation Stage
|
Questions
|
Technical assessment
-
Is the detailed design of S/W appropriate?
-
Does the detailed design of S/W meet the product specifications?
-
Are the implementation trade-offs proposed for S/W appropriate for the project?
-
Are the algorithms appropriate?
-
Have the key risks related to S/W been correctly identified and evaluated?
-
What contingencies can we propose against those risks?
-
Are the R&D test programs for S/W (Unit, Integration) appropriate?
-
What are the open issues which need to be addressed regarding S/W?
Cross-functional check
-
Does the S/W detailed design support the Serviceability requirements?
-
Does the S/W detailed design support the Test requirements?ASICS schedule
and resources
S/W schedule and resources
-
Is the proposed schedule for S/W implementation work appropriate?
-
Are the corresponding resources appropriate (# of people, type of skills)?
-
Have we identified additional S/W risks (technical, cost, schedule basis)?
-
From a S/W standpoint, are we ready to proceed to the Implementation stage?
|
Input
|
Marketing
-
MRD (remains a living document after the Planning & Specification Stage Review but with limited changes
expected)
Service
-
Serviceability objectives
-
Product Service Plan
R&D
System Architecture
-
Architecture reference model
ASIC Design
-
Model definition
-
Model diagram
-
Pinout
-
Programmer reference model
-
Block diagrams
-
Pseudo code
-
Simulation results
ASIC Verification
-
All 4 stages of verification ready
-
Results of before-tape-out unit and integration testing
-
List of bugs
H/W design
-
Interface between H/W - H/W, H/W - S/W, H/W - ASICs, H/W - system
-
95% Jedec files completed
-
Electrical schematics ready
-
Timing, thermal (70% of work only) and performance analysis
-
Mechanical drawings
-
Preliminary placement
-
BOM
-
Layout recommendations (size, # of layers, special line, list of critical
signal files)
-
Utilities for testing
-
Board programmer reference model
-
Quality reliability and compliance
-
Design documentation (95%)
S/W design
-
SRS
-
S/W design document (for each block)
-
Management interfaces specifications (MIBs and relevant NMS application,
LMA)
-
Detailed performance estimations
-
S/W integration and module test plan
-
Updated S/W development plan
-
S/W configuration management tool and usage methodology ready
Engineering Prototypes
-
Build plans for prototypes
-
Usage plans for prototypes (R&D, Manufacturing, Safety regulations)
R&D Test
-
Final Unit / Integration Test programs
-
Final Engineering Test programs
-
Engineering Test tools and equipment list
-
Initial System and Alpha Test procedures
-
Test environment set-up, external labs ordered
Manufacturing
-
Test Vehicle results and required action items
-
Progress report on DFX activities (completed and remaining)
-
Manufacturing costs, NREs and GM analysis
-
Material Flow
-
Updated Manufacturing Plan (Gantt chart)
Manufacturing Test
-
Final placement of test points
-
Updated Test equipment availability plan
-
Frame of S/W testing
Materials
-
List of qualified vendors
Finance
-
Estimates of product GM in production (on a per component basis)
|
Deliverables
|
S/W detailed design validated
List of open issues related to S/W detailed design
Updated S/W schedule for Implementation Stage
Additional S/W resources for Implementation Stage identified (if any)
|