Stage: Design and Verification, Development, Product Release
Definition |
Design and verification stage activities include:
Development stage activities include:
Product Release stage activities (before FCS) include:
|
---|---|
Dependencies |
This step should start after the Manufacturing Strategy and Test step (after
CDR)
This step overlaps with the Engineering Prototypes step This step overlaps with the Pilot Build step This step ends at FCS |
Input |
DFT
Test plan Draft of S/W testing for JTAG, functional, burn-in BOM |
Deliverables |
For the design and verification stage Review:
For the development stage Review:
For FCS:
|
Responsibility |
Manufacturing Test Engineer at Atrica |
ResourcesWorkloadCompetencies |
2 FTE |
Lead-times |
- |
Metrics |
Fault Coverage
Diagnostic Level Isolation Evaluation of sub-contractor performance:
|
Guidelines |
Test Coverage Plan for all Stations
Process Readiness Matrix DFT Guidelines ICT & JTAG Test Development Procedure Test guidelines New Product Introduction Guidelines (NPI) |