Stage: Development
Definition |
The objective is to validate the Manufacturing assembly and test process before launching full production. Activities include:
|
---|---|
Dependencies |
This step should start at the beginning of the development stage
This step overlaps with the end of the Prototypes step This step overlaps with the Process Validation step The end of the step triggers production Product Release |
Input |
Test Vehicle report- to ensure full implementation
DFX analysis report- to ensure full implementation Pilot production plan Manufacturing documents - Production File Pilot build Production Order (PO) |
Deliverables |
Delivery of Pilot units to Atrica.
Pilot Build report including Final assembly & test yields. Process validation documents for Manufacturability and Testability- Process Readiness. |
Responsibility |
Manufacturing Product Engineer with CM Technical Coordinator |
ResourcesWorkloadCompetencies |
MPE (100%) |
Lead-times |
4 weeks for PCB production (overlap with the design and verification stage)
4 weeks for Pilot Build (Assembly and test) |
Metrics |
New Product Introduction Readiness Metrics (including risks)
Updated NRE forecast tableUpdated GM and Cost analysis model Project basics Updated Project objectives (one page summary) Production Readiness Matrix Test Coverage and Yields table (targets vs actual) |
Guidelines |
PCB assembly guidelines / Test guidelines
New Product Introduction Guideline. |